Product

Built for real world Construction Scenarios

Purpose-Built for Project Teams.

Specialized procurement planning for Project Engineers and Project Managers who manage all Materials ordered by Subs/Suppliers for Construction Projects.

Handle Real-World Complexity

Comprehensive Scenario Coverage.

We handle procurement complexity that others struggle with. ConstructivIQ supports real-world scenarios that competitors can’t model, from simple submittal-to-delivery workflows to complex multi-phase assemblies with interdependent materials.

ConstructivIQ comprehensive scenario coverage for complex procurement workflows
ConstructivIQ customizable procurement process configuration
Your Process, Your Way

Customizable to Your Process.

We adapt to how you work, not the other way around. Every company has its own procurement processes, every project has unique requirements, and each material type requires a different tracking approach.

AI That Actually Helps

Cognitive Intelligence.

We make your system smarter by identifying scenarios that will cause potential issues before they occur. Because ConstructivIQ models real-world complexity, we can use AI to detect non-typical, exception patterns and suggest how to handle them.

ConstructivIQ AI-powered cognitive intelligence detecting procurement risk patterns
ConstructivIQ connected integrations across Procore, Autodesk, P6, and MS Project
Works With What You Have

Connected Across Systems.

We integrate with your existing tools, enabling true collaboration across organizational boundaries. Integrations with Procore, Autodesk Forma (formerly Autodesk Construction Cloud), Oracle P6, and MS Project. Real-time collaboration without forcing everyone onto a single system.

Integrations

Works with your Workflows.

Proven on Real-World Scenarios.

ConstructivIQ supports the edge cases that others can’t model—the scenarios that actually cause delays.

Watch the ConstructivIQ product demo

Embedded Materials

Plan for early-sequence submittals that inform critical layout, rough-in, and build-in conditions before installation occurs.

OFCI Tracking

Coordinate owner-furnished, contractor-installed equipment.

Field Measurement

Plan for materials that require on-site field measurement before fabrication.

Skids

Manage pre-assembled mechanical units with multiple components

Wide Coverage

Built for Complex Construction Markets.

From mission-critical data centers to healthcare facilities, ConstructivIQ handles the procurement complexity unique to each market.

Mission Critical

Data center facilities with long-lead equipment and tight commissioning windows.

Arenas

Large-scale venues with complex MEP coordination and fixed event deadlines.

Healthcare

Phased construction with strict compliance and infection control requirements.

Higher Education

Multi-building campuses working around academic calendars

Multi-Family

Buildings with multiple individual living units for separate households.

Answers to Common Questions

Frequently Asked Questions

Yes, and adoption is additive not replacement.

Procore and Autodesk Forma (formerly Autodesk Construction Cloud or ACC) are the execution layer: submittals, RFIs, daily logs, document workflow. ConstructivIQ is the planning layer above them. We pull submittal status and schedule data from your existing systems, calculate required-on-job dates automatically, and recalculate them the moment the schedule changes.

Your teams keep working in Procore or Forma. ConstructivIQ adds the procurement planning layer they’re missing. No rip and replace. No duplicate data entry. No new system to force onto users beyond the PE or PM who owns procurement.

Excel and Smartsheet templates work for the first project. They break down on the second because they cannot solve four structural problems:

  • Schedule updates go stale immediately. Every required-on-job date needs manual updating. On projects with thousands of materials, this either doesn’t happen or happens too late.
  • Complex scenarios don’t fit. Embedded materials, OFCI, field-measured components, and skids need multi-relationship modeling that spreadsheets can’t do natively.
  • Collaboration is manual. Nothing syncs with your PM system, scheduling tool, or subcontractors. Every status update is a phone call or email.
  • Data dies with the project. Lead times and supplier performance don’t compound across your portfolio.

ConstructivIQ solves all four by design.

Live in an hour, fully configured in weeks.

The one-hour onboarding session requires three inputs:

  • Your submittal log from Procore or Autodesk Forma
  • Your schedule from Oracle P6 or Microsoft Project
  • An existing material log to import, or a fresh start with our templates

You leave the session live on the platform with your project data connected. Full setup, wiring the dependencies between submittals, materials, and schedule activities so risk is flagged automatically, typically takes a few weeks. Templates make subsequent projects deploy substantially faster.

SOC 2 Type 2 compliant. Customer data hosted in secure cloud infrastructure with encryption in transit and at rest, role-based access controls, and audit trails for sensitive operations.

Nothing. Subcontractors and vendors either log in directly at no cost, or respond via email-based workflows that ConstructivIQ generates for lead time updates, fabrication status, and delivery confirmations. Either way, no license fee or seat cost falls on your subs.

Three flexible licensing options: single project, multi-project bundle, or enterprise agreement for GCs deploying across their portfolio. Pricing scales with project size and duration. Contact us for a tailored quote.

Find out how we may help you

Schedule a Custom Demo.

Chat bubbles illustration representing customer contact

Trusted

by Top General Contractors.

AICPA SOC compliance certification badge